Detailing starts
from a model.

The first week of a detailing job is usually typing: grids, columns, beams, one by one into the model. Drawing to Model reads the framing plan, shows you what it read laid over the drawing, and once a detailer approves it, places the steel in SDS/2. 1,673 members in 205 seconds on one job.

One job
1,673 members
Time
205 s
Into
SDS/2
  • Uploadthe framing plan, as the engineer issued it
  • Readgrids, levels, columns, beams, braces, sizes, elevations
  • Overlaywhat it read, drawn over the plan, member by member, with every doubt flagged
  • Approvea detailer walks the overlay and approves it, or corrects it first
  • Placethe office PC places the approved members in the SDS/2 job
  • Receiptevery placed member carries where it came from: the sheet, the grid, the line

Plan in,
steel out

Nothing is built until a person has looked at the overlay. That rule does not bend for a deadline.

1

Read

The plan is read: the grid, the levels, every member with its size and its ends. Anything it is not sure of is flagged, not guessed.

Machine reads
2

Overlay

What it read is drawn over the plan in colour. A member it is unsure of is marked for a look. A member it could not read is listed, not guessed.

Machine shows
3

Approve

A detailer walks the overlay against the plan, corrects what needs it, and approves. Their name goes on the approval.

Person approves
4

Place

The approved members are placed in SDS/2 by the office PC. Each carries a receipt: which sheet, which grid, which line it came from.

Machine places

What a person
still does

The model it places is a start, not a finished job.

  • 01Approves the overlay.Nothing is placed in the model without a detailer's approval of what was read.
  • 02Connects and details.Members are placed with size, position and ends. Connections, copes and the sheets are the detailer's work, as before.
  • 03Not yet.It places framing: columns, beams, braces. Stairs, handrail and miscellaneous steel are modelled by the detailer.

Send us a framing plan.

Send one package. You will see the overlay before the model exists, and then the members placed in SDS/2.

Start a package
what to send
— contract drawings and specs
— your shop standards
— the sequence or phase
— the date you need it